Risk Management Plan - Product Name ​

Template IDLocal ID
Template VersionVersion
ApprovalApprover name

1. Introduction ​

The risk management plan corresponds to the risk policy defined in the local SOP for risk management of in-house software. It follows the requirements of ISO 14971:2019 with particular consideration of the additional requirements from Regulation (EU) 2017/745.

1.1 Product ​

Product nameVersion
Product Name1.0

1.2 Definitions ​

TermDefinition
SOPStandard operating procedure

2. Risk Management Team Members ​

Example table:

IDNameRoleResponsibilityQualificationAffiliation
RTM_1Project lead nameProject lead, risk managerLeading and monitoring the project development process; monitoring and control of risk-related activitiesDegree, specialisation, experienceHospital Name
RTM_2Technical expert nameTechnical expertEvaluation of technical risksDegree, specialisation, experienceHospital Name
RTM_3Technical tester nameTechnical testerTechnical assessment of risk control measuresDegree, specialisation, experienceHospital Name
RTM_4Data processing expert nameData processing expertEvaluation of risks arising from patient data processingDegree, specialisation, experienceHospital Name
RTM_5Medical and risk expert nameMedical expert, risk managerEvaluation of medical risks; assessment of product use in routine patient care ("product risk")Degree, specialisation, experienceHospital Name
RTM_6Risk management reviewer nameRisk managerReview of the risk management systemDegree, specialisation, experienceHospital Name

3. Schedule ​

Schedule and responsible team members for the risk management activities:

Risk management activityResponsible personsDate
System-level risk analysis: risk analysis for use of the overall therapy system under real-use conditionsRTM_2, RTM_4, RTM_5Day-Month-Year
Product-level risk analysis: risk analysis for the product design, including packaging and labelingRTM_2, RTM_4, RTM_5Day-Month-Year
Process-level risk analysis: risk analysis for manufacturing processes including shipping and storageRTM_2, RTM_5Day-Month-Year
Verification of risk control measures: check whether all risk control measures resulting from the risk analysis have been implemented and are effectiveRTM_1, RTM_2, RTM_3, RTM_5Day-Month-Year
Risk management review: review of risk management activities and documentation as part of risk-management-reportRTM_6Day-Month-Year; interval of the recurring review
Collection and review of relevant production and post-production information: collection and evaluation of data from the architecture and design review, unit and integration tests, process validation, and the phase after deployment; documentation as part of continuous updates to the risk management reportEvaluation: RTM_1, RTM_2, RTM_3, RTM_4, RTM_5At least once per year

4. Risk Management Acceptance Criteria: Individual Risks ​

The acceptance criteria for individual risks are used as specified in the risk acceptance matrix in risk-table. The following adjustments were made compared with the local SOP for risk management of in-house software:

  • The yellow risk acceptance level AL2 was removed because it would otherwise remain without consequences in the further process.
  • The probabilities in the process risk acceptance matrix and the product risk acceptance matrix were specified for the use case. For the latter and for the product hazard analysis, possible harms were considered from a minimum occurrence probability of 1 per 1,000,000 user sessions.

5. Risk Management Acceptance Criteria: Overall Residual Risk ​

The methods for evaluating the overall residual risk and the monitoring after deployment of the in-house software are applied as defined in the local SOP for risk management of in-house software.

6. Applicable Documents ​

Document nameReference (local ID)
local SOP for risk management of in-house softwarelocal ID
risk-tablelocal ID
risk-management-reportlocal ID